Over the last two years, we…
Chose a building site




Installed a temporary electric panel


Drilled a well


Added several feet of material to the downhill side of the building site





Removed material on the uphill side of the building site


Staked out the final location for the building



Started building a retaining wall






Relocated “Dr. Suess”


Leveled out the final grade for the site


Got a hot tub!